Building Information Model is an Artificial intelligence based process that offers professionals in planning, designing, and managing buildings and infrastructure. BIM allows better use of resources, workflows and leads to productivity and profitability.
Whether it is project management, land surveying, road design, structure design or construction- BIM’s role has almost become indispensable for beyond the ordinary results. Using it, owners can improve building quality, reduce building lifecycle costs, better understand design projects from beginning to end and increase occupancy.
BIM AI technology aassit architects, project managers in construction managmement of roads, structures, managing property, MEP, Utilities and schedule managment
3D BIM:
Layout Drawings (PDF / CAD), Measurements, Basic CAD Plan, Elevations & Area, Builders work drawings etc.
BIM Coordination Modeling:
3D Model, Design drawings/PDF, Construction Drawings and Builders work
Scan to BIM Modeling:
Laser scans or survey drawings in 2D
4D/5D BIM:
3D BIM Model with minimum 300 LOD, Model Illustrations, Working Illustration
3D BIM:
3D BIM LOD 100 model, LOD 200 model, LOD 300, LOD 350, LOD 400, LOD 500 as specified
BIM Coordination Modeling:
Coordinated BIM Models (Architecture, Structure, MEP), Arrangement of MEPs / Shop Drawings, Production drawings
Scan to BIM Modeling:
3D BIM Model, 2D Drawings as required
4D/5D BIM:
4D BIM Model with Spatial alignment and simulation videos for Sequencing
Airpix provides a way to use BIM concurrently on most aspects of building life cycle process and is used to monitor the productivity of a construction process. BIM try out solutions in advance before building the structure on site: with a constructible model, the structure can be prototyped virtually. Professionals can understand and review the design more easily, which helps guarantee its accuracy and completeness, and visualize and evaluate alternatives in terms of cost and other project parameters.
The software will be used to foresee problems and coordination between different contractors and as a way to generate construction documents and processes that will later be implemented during the physical process.